Põhjalikuma teabe saamiseks selle kohta, kuidas – ja kus – meie tooteid on kasutatud, soovitame heita pilgu alltoodud objektiprofiilidele.

E20 Gothenburg

Major carriageway refurbishment has been carried out to the E20 near Gotheburg, western Sweden, during June and July 2016. Asphalting took place in parallel across three lanes to speed surfacing works and minimise disruption to traffic.

Loe lähemalt E20 Gothenburg

Essingeleden, Sweden

When one of Sweden’s most heavily trafficked roads needed resurfacing, the durability of polymer modified bitumen was required to meet the challenge.

Loe lähemalt Essingeleden, Sweden

E6 into Malmö, Sweden

The E6, which is under the Swedish Transport Administration’s area of responsibility, apart from a small section that the City of Malmo manages, carries up to 40,000 vehicle movements per day on certain parts of the route.

Loe lähemalt E6 into Malmö, Sweden

New Road, Nowe Zawady, Poznan, Poland

There was a need to improve traffic flow in an important part of the City of Poznań, connecting the Środka roundabout with the crossroads at Prymasa Hlonda and Głowna streets. It was decided to build a 1.13km long dual carriageway; the value of the contract being PLN40 million.

Loe lähemalt New Road, Nowe Zawady, Poznan, Poland

A9 at Carrbridge, Scotland

Environmentally sustainable techniques and long lasting materials were required for a road reconstruction contract on the A9 at Carrbridge near Inverness. The two lane single carriageway originally featured a lean mix concrete base.

Loe lähemalt A9 at Carrbridge, Scotland

N03/56 Zürich-Wollishofen to wädenswil

A constant increase in traffic – both in terms of the number of vehicles and their axle loads – has put increasing strain on the road surface. The preferred immediate remedial measure was to restore the road surface on the stretch described.

Loe lähemalt N03/56 Zürich-Wollishofen to wädenswil

Federal highway A5 (BAB 5), between Frankfurt and Darmstadt

The section of Federal highway A5 between Frankfurt and Darmstadt is one of the most heavily trafficked highways in Germany carrying more than 125,000 vehicles per day. Part of the important north - south axis, it provides a link between Frankfurt airport and the southern parts of Germany and also Switzerland.

Loe lähemalt Federal highway A5 (BAB 5), between Frankfurt and Darmstadt

E4 Motorway, Kropp interchange, Helsingborg, Sweden

Large scale trials of flexible surfacing materials are under way in Sweden. The hope is that flexible bitumen can be a key component in repairing surfacing courses with significant crack formation.

Loe lähemalt E4 Motorway, Kropp interchange, Helsingborg, Sweden

A36 - Beaune to Besançon

The recycling approach is gaining value in light of corporate commitments to sustainable development. A professional goal has been set to recycle 60% of bituminous materials by 2012. Consideration was given to using recycled materials during the reinstatement of carriageways of the A36 autoroute in France.

Loe lähemalt A36 - Beaune to Besançon

RV3 Tynset/Alvdal, Norway

The existing pavement for road RV3 in Norway was based on a rather soft 330/430 PEN standard bitumen. High vehicle use in cold climatic conditions meant that the road was suffering and its load carrying capacity had begun to fail.

Loe lähemalt RV3 Tynset/Alvdal, Norway

E19, Meer, Belgium

Resurfacing of motorway E19 at Meer – close to the border with the Netherlands – called for the use of enhanced performance asphalt. Work had to take place with minimum disruption to busy traffic flows between countries.

Loe lähemalt E19, Meer, Belgium

E47/E20, Falster, Danmark

The E47/E2 forms part of Denmarks 'Big H' motorway network. A seven kilometre section of the 'Sydmotorvejen' route's southbound carriageway had fallen into disrepair, becoming cracked and uneven. Major reconstruction of the concrete pavement was required.

Loe lähemalt E47/E20, Falster, Danmark

Saksa Linnade Osnabrücki ja bremeni vaheline kiirtee A1

Nynas Endura Z2 on modifitseeritud Premium-klassi kuuma asfaltsegu sideaine. Sel on suurepärased töötlemisomadused ning see on spetsiaalselt välja töötatud optimaalse tasakaalu saavutamiseks vastupidavuse ja elastsuse vahel. Nynas Endura Z2 sobib kõige suurema koormusega sillutamisrakendusteks. Nypol RX 25/2 on spetsiaalne polümeermodifitseeritud seguaine, mida kasutatakse kuuma asfaltsegu rakendustes, kui miinimumnõudeks on regenereeritud asfaldi kasutamine 20% ulatuses.

Loe lähemalt Saksa Linnade Osnabrücki ja bremeni vaheline kiirtee A1

E18 Langaker - Bommestad, Norway

Poor surface conditions and high traffic loads on a section of the E18 between Langåker and Bommestad led to serious congestion. It became apparent that the bottleneck needed to be relieved with the construction of a new four lane, 8.1km long highway.

Loe lähemalt E18 Langaker - Bommestad, Norway

A1 Motorway, Klaipeda, Lithuania

The A1 is Lithuania's main cross country route, linking Vilnius – the capital in the east – westwards to Kaunas and then Klaipeda by the Baltic sea. Maximum traffic density along the 300km long, dual four lane highway is 40,000 vehicles per day. It is towards Klaipeda that a 3.4km stretch of the motorway's eastbound carriageway was giving trouble.

Loe lähemalt A1 Motorway, Klaipeda, Lithuania

Expressway S10 (Montaniec, Poland)

The expressway is S10 between Szczecin (Poland’s largest Baltic seaport) and Motaniec, in the north west of the country; it carries 17,000 vehicles a day, 12% of these heavy goods vehicles.

Loe lähemalt Expressway S10 (Montaniec, Poland)

UL. Żeromskiego, Poznan, Poland

Nypave FX 25 PL is special designed bitumen for very high modulus asphalt mixtures (EME) which complies with EN 12591 and Nynas specifications.

Loe lähemalt UL. Żeromskiego, Poznan, Poland

A1 Motorway (Paris/Lille) between Carvin and Lesquin

Nynas FX 15 is a paving grade bitumen suitable for the manufacture of high modulus asphalt formulated with recycled materials.

Loe lähemalt A1 Motorway (Paris/Lille) between Carvin and Lesquin

Road sections at Kuivastu-Kuressaare and Pärnu-Lihula, Estonia

Nymuls SD 105 is a polymer modified surface dressing emulsion with good retentive properties that enables traffic to get moving sooner than with a conventional surface dressing.

Loe lähemalt Road sections at Kuivastu-Kuressaare and Pärnu-Lihula, Estonia


Tepp, Indrek

Country Sales Manager

Phone: +372-6-319897

Mobile: +372-5-048684


Tõugu, Heikki

Sales Manager

Phone: +372-6-319898

Mobile: +372-5-045263


Rebane, Olev

Technical Manager

Phone: +372-631 98 96

Mobile: +372-504 86 87


Laasik, Peep

Finance Manager

Phone: +372-631 98 95

Mobile: +372-505 42 71


Solomatina, Maria

Sales Assistant

Phone: +372-6-319422


Talmre, Gea

Sales Assistant

Phone: +372-631 94 22