Jentzsch, Mario
Sales Director Western Europe
The Tingstad Tunnel under the Göta älv river consists of two sections, each with three lanes, connecting Hisingen with mainland Gothenburg. The traffic is heavy, with up to 3,500 vehicles an hour in each direction.
Mehr erfahren New Tingstad Tunnel, GothenburgThe asphalt on the M25 Dartford crossing's western tunnel under the trucks is pounded 24 hours a day, seven days a week, and the carriageway's 11 year old surfacing had become heavily wheel tracked and potholed. Resurfacing was required.
Mehr erfahren M25 Dartford Crossing Western Tunnel, England
Um auf dem aktuellen Stand mit den Neuigkeiten aus der Branche zu sein, blättern Sie durch unser halbjährliches Online-Magazin. Mehr lesen über Performance Magazine
Jentzsch, Mario
Sales Director Western Europe
Driske, Lars
Technical Manager Western Europe
Lien, Diem
Sales Executive, Bitumen Western Europe